
LV Switchgear Busbar Support
The duty at a glance
SM stand-off insulators carrying the main busbar, with the shell colour carrying the phase marking instead of a label that peels off.
The assembly repeats the same bar layout across twelve panels, so the insulator was fixed once and the only variable left on the order was which phase gets which colour. The SM family lists height and thread in the specification, so the bar foot and the fixing do not change between positions.
The brown high-strength-insert line was kept for the heaviest bar foot, where the mechanical load is highest; the standard SM34*6 carries the rest. Both are separate item numbers, so a mixed quantity is two lines on the packing list rather than one instruction to the bench.
Colour is an ordering option for phase marking, not a rating; the customer's own marking convention governs which shell colour lands on which phase.

Item numbers selected
The item numbers named on the order, each with the specification that decided it. The item number links through to its product page.
- 01SPZL502079 — SM34*6 stand-off insulator for the main bar
- 02SPZL501648 — SM7130 brown, high-strength insert, for the heavy bar foot
- 03006 SM30 — KSM3032*6 for the auxiliary bar
Installed views
Site photography is being added.
How a duty becomes an order
- 01
Enquiry
The equipment, the voltage class and the item numbers you are considering — or a drawing if nothing in the range fits. A photo of the mounting panel and the busbar size answers most of it.
- 02
Selection & Confirmation
We read the specification back to you: height, thread at each end, shell material, colour and unit. Where a standard line does not fit, the alternative is stated before price is discussed.
- 03
Quotation & Lead Time
Price, lead time and packing detail for the exact item numbers quoted, including the carton dimensions and the packing for each line.
- 04
Production & Dispatch
Confirmed lines follow the agreed schedule. Packing uses the carton dimensions in the item specification and the shipment goes out against the confirmed list.
What travels with the insulators
An insulator order is rarely only insulators. These are the lines that come with it and decide whether the job goes smoothly.
- Shell colour agreed against the customer's phase marking
- Height and thread stated per item number
- CJ / CT supports ordered as their own item numbers
- Carton dimensions and unit on the packing list
Application information
- Duty
- A low-voltage switchgear assembly
- Application duty
- LV Switchgear
- Delivered
- 2026
- Quantity supplied
- 640 pcs across two tranches
- Supply window
- 6 weeks
- Region
- East China
Other duties
Work in the same duty first, then the rest of the range.
Describe the equipment and we will name the item numbers
Send the voltage class, the busbar or panel spacing, the mounting hole pattern and the thread at each end. We come back with the standard lines that fit, or tell you the range does not.

