
Overhead Line Insulation
The duty at a glance
Porcelain and composite insulators for outdoor line duties, chosen for the weather the string will sit in.
The line runs through a coastal section, so the composite silicone-rubber housing was chosen there for its hydrophobic surface, while porcelain carries the inland posts. Both are listed by voltage class and height, so the schedule reads straight off the line design.
The composite FZSW3 family is written against the system voltage — 12, 24 and 40.5 kV — so the string for each section is selected by the rating the design already fixed.
Porcelain and composite are separate families with their own item numbers, which is what keeps a mixed order auditable on the packing list.

Item numbers selected
The item numbers named on the order, each with the specification that decided it. The item number links through to its product page.
Installed views
Site photography is being added.
How a duty becomes an order
- 01
Enquiry
The equipment, the voltage class and the item numbers you are considering — or a drawing if nothing in the range fits. A photo of the mounting panel and the busbar size answers most of it.
- 02
Selection & Confirmation
We read the specification back to you: height, thread at each end, shell material, colour and unit. Where a standard line does not fit, the alternative is stated before price is discussed.
- 03
Quotation & Lead Time
Price, lead time and packing detail for the exact item numbers quoted, including the carton dimensions and the packing for each line.
- 04
Production & Dispatch
Confirmed lines follow the agreed schedule. Packing uses the carton dimensions in the item specification and the shipment goes out against the confirmed list.
What travels with the insulators
An insulator order is rarely only insulators. These are the lines that come with it and decide whether the job goes smoothly.
- Shell colour agreed against the customer's phase marking
- Height and thread stated per item number
- CJ / CT supports ordered as their own item numbers
- Carton dimensions and unit on the packing list
Application information
- Duty
- An overhead distribution line
- Application duty
- Overhead Lines
- Delivered
- 2025
- Quantity supplied
- 520 pcs
- Supply window
- 8 weeks
- Region
- North China
Other duties
Work in the same duty first, then the rest of the range.
Describe the equipment and we will name the item numbers
Send the voltage class, the busbar or panel spacing, the mounting hole pattern and the thread at each end. We come back with the standard lines that fit, or tell you the range does not.


