
Transformer & Motor Terminal Insulation
The duty at a glance
Terminal-board insulators sized by the thread the winding lead already uses, in epoxy and porcelain.
On a machine the terminal insulator is decided by the winding lead and the board, so the thread is the first dimension on the order. The M10 main lead and M6 auxiliary are separate item numbers, which is what keeps the two from being swapped at the bench.
The custom copper-core line covers the heavy lead where a standard body does not leave enough thread; it is quoted from the drawing with the item number, unit and packing stated together.
Epoxy and porcelain bodies are both listed, so the builder picks the material against the duty and the temperature the terminal sits in.

Item numbers selected
The item numbers named on the order, each with the specification that decided it. The item number links through to its product page.
Installed views
Site photography is being added.
How a duty becomes an order
- 01
Enquiry
The equipment, the voltage class and the item numbers you are considering — or a drawing if nothing in the range fits. A photo of the mounting panel and the busbar size answers most of it.
- 02
Selection & Confirmation
We read the specification back to you: height, thread at each end, shell material, colour and unit. Where a standard line does not fit, the alternative is stated before price is discussed.
- 03
Quotation & Lead Time
Price, lead time and packing detail for the exact item numbers quoted, including the carton dimensions and the packing for each line.
- 04
Production & Dispatch
Confirmed lines follow the agreed schedule. Packing uses the carton dimensions in the item specification and the shipment goes out against the confirmed list.
What travels with the insulators
An insulator order is rarely only insulators. These are the lines that come with it and decide whether the job goes smoothly.
- Shell colour agreed against the customer's phase marking
- Height and thread stated per item number
- CJ / CT supports ordered as their own item numbers
- Carton dimensions and unit on the packing list
Application information
- Duty
- A motor and transformer builder
- Application duty
- Transformer & Motor
- Delivered
- 2026
- Quantity supplied
- 300 pcs
- Supply window
- 7 weeks
- Region
- South China
Other duties
Work in the same duty first, then the rest of the range.
Describe the equipment and we will name the item numbers
Send the voltage class, the busbar or panel spacing, the mounting hole pattern and the thread at each end. We come back with the standard lines that fit, or tell you the range does not.

